The strong winds during the past three weeks have severely
hampered the replacement of the steelwork at the Pier Head. Hopefully
conditions will improve and the last section can be completed before too long.
The was a brief lull in the wind which was taken advantage of,
and we a team of divers to carry out a final survey of the columns below the
waterline to check the condition and see if there is the need for any further
repair work needed.
Work on the Visitor Centre continues, with the cladding in the
re-cycled decking nearly completed.
Access to the far end of the Pier Head is now enabled, more of
the old deck boards have been recovered .
These are being prepared and will be
used to complete the cladding.
Inside the building, the services and sprinklers have been
installed and the floor build up with the insulation and heating mat installed.
Work to the toilets and kitchen is also underway.
Work started to construct the steps and arena seating on the
North end of the building.
Under the Pier the main services , gas, water, electric and
drainage. These pipes and wires are fixed under the structure with access being
gained via the new crawlway.
On the East side new kiosks have been erected. These will be
available to rent, more will be erected on the West side.